Wesleyan University , Phase I and Phase II, Center for Film Studies & Cinema Archives
Project Highlights
Location: Middletown, CT
Year Completed: 2006
Cost: $11
PRINCIPAL- IN-CHARGE: James Brockman, P.E.
CHIEF STRUCTURAL ENGINEER: Michael Plickys, P.E.
CHIEF CIVIL ENGINEER: Roy Seelye, P.E.
PROJECT DURATION: 2003-2006
DESCRIPTION: Performed the structural and civil design for a new film studies and cinema archives facility with a 429-seat Cinema. The 38,400 S. F. facility is a one-story, steel-framed structure with a heavy timber framed Atrium. The civil / site development included new access drives, parking areas, utilities and all related site construction.