Project Highlights

Location: Storrs, CT
Year Completed: 2002
Cost: $23 M

REFERENCE: Mr. George T. Kraus, P.E. Director of Design, Planning,
and Construction Management A/E Services
31 Ledoyt Road, U-3038 Storrs, CT 06269 860/486-3236
PRINCIPAL-IN-CHARGE: James Brockman, P.E.
CHIEF STRUCTURAL ENGINEER: Michael Plickys, P.E.
PROJECT DURATION: April 1998 – October 2002
GROSS AREA: 440,000 SF

DESCRIPTION: This new Design/Build parking structure is located on Stadium Road on the West side of the campus. This six level garage consists of slab on grade parking with five levels of precast concrete tees. There are four bays of tees spanning 55 feet in the north-south direction. The total length of the garage is approximately 350 feet providing nearly 440,000 total square footage. Currently there are slightly over 1,500 parking spaces available in the garage. Macchi Engineers was responsible for the civil design, layout, operational plan, schematic design, RFP, structural threshold review, and duties relating to Owner’s Representative including full-time, on-site construction administration and inspection.

Project Categories

 

Testimonials

We place a great deal of value in what our clients say about working with us. More

Our Awards

While our favorite recognition is meeting and exceeding our clients expectations, it's nice to win an award or two now and then! More