Old Hartford Road Bridge
Project Highlights
Location: Colchester, CT
Year Completed: 1998
Cost: $800,000
REFERENCE: Salvatore A. Tassone, P.E. Town of Colchester 860-537-7281
PRINCIPAL-IN-CHARGE: James Brockman, P.E.
CHIEF STRUCTURAL ENGINEER: Michael Plickys, P.E.
PROJECT DURATION: August 1998
GROSS AREA: 16 Meter Long
DESCRIPTION: Total replacement and widening of local town road bridge included the design and layout of all structural components for pre-stressed concrete box beam bridge with concrete abutments founded on steel piles. Complete coordination of all phases of (ISTEA) Federal-Aided project. Provided full-time, on-site construction inspection and administration, permit documentation and traffic maintenance. Also completed hydraulic and scour analysis of the existing and proposed bridge.