sign up for news
Higganum Reservoir Dam
Higganum Reservoir Dam
Higganum Reservoir Dam
Higganum Reservoir Dam
click

Higganum Reservoir Dam

Project Highlights

Location: Haddam, CT
Year Completed: 2004
Cost: $5 M

PRINCIPAL-IN-CHARGE: James Brockman, P.E.
PROJECT MANAGER: John Brochu, P.E.
REFERENCE: Ted Rybak, Civil Engineer, III DEP, Inland Water Resources Division
79 Elm Street Hartford, CT 06106-5127 860/424-3883
PROJECT DURATION: 1995 - 2004
WATERSHED AREA: 6.6 Square Miles
LAKE AREA: 32 Acres

DESCRIPTION: The primary feature of the Higganum Reservoir Dam project is the modifications and additions to the existing spillway to maintain current outflows without overtopping the dam. The historic nature of the old spillway presented a unique design challenge. Our goal was to maintain the existing structure coupled with repairs that not only meet the structural and hydraulic requirements, but also do not detract from its historic value and appearance. Additional repairs consist of seepage control, enhanced stability of the earthen dam, new drawdown facilities, and slope protection. The reservoir is intended to be used for recreation purposes. Therefore, vehicle access, parking, pedestrian walks, repair of a stone arched pedestrian bridge, and handicapped accessibility features are included in the project. Macchi Engineers completed the Phase II Study, design of dam and spillway, and the full-time, on-site construction administration and inspection.

Project Categories

 

Testimonials

We place a great deal of value in what our clients say about working with us. More

Our Awards

While our favorite recognition is meeting and exceeding our clients expectations, it's nice to win an award or two now and then! More