Eastern Connecticut State University, Hurley Hall
Project Highlights
Location: Willimantic, CT
Year Completed: 1998
Cost: $3 M
REFERENCE: Alexandria Roe CSU System
39 Woodland Street Hartford, CT 06105-2337
PRINCIPAL: James Brockman, P.E.
CHIEF STRUCTURAL ENGINEER: Michael Plickys, P.E.
GROSS AREA: 34,000 SF
DESCRIPTION: Expansion of the existing University Dining Facility included the structural and civil design of a new 10,000 SF steel-framed addition with a moment framed lateral system, and 24,000 SF of renovations to the existing building. The new construction consisted of tight site constraints that required creative foundation solutions. Macchi Engineers also performed all related civil and site work including new walkways, drainage, utilities and loading dock.






