sign up for news
Branford High School
Branford High School
click

Branford High School

Project Highlights

Location: Branford, CT
Year Completed: 1998
Cost: $23 M

REFERENCE: David Kozma Chairman of the Building Committee 42 Applewood Road Branford, CT 06405
PRINCIPAL-IN-CHARGE: James Brockman, P.E.
CHIEF STRUCTURAL ENGINEER: Michael Plickys, P.E.
GROSS AREA: 84,000 SF New Addition
SITE ACREAGE: 27 Acres Site Development

DESCRIPTION: Structural design totaled 243,00 SF of new additions and modifications to existing school structure. New steel-framed, 84,000 SF addition with foundation system consisting of a series of steel pipe friction piles. Modifications to existing building included removal of bearing walls and installation of new stairs.

The site development portion of the project included civil design of utilities and grading for new parking areas, sidewalks and a new front entrance / drop off. In addition, a new synthetic track and multi purpose field, tennis courts and two baseball fields were included in the project. The project was located along a tidal river along the Long Island ound and required DEP permitting for bank stabilization and to provide a boat launch area for public use.

Project Categories

 

Testimonials

We place a great deal of value in what our clients say about working with us. More

Our Awards

While our favorite recognition is meeting and exceeding our clients expectations, it's nice to win an award or two now and then! More